Example 6: design of rectangular beam

design rectangular sections for the beams, loads, and ρ=0.01425. Beam weights are not included in the loads shown.  Assume concrete weighs 150 lb/ft3 , fy= 60,000 psi, and fc'= 4000 psi, unless given otherwise.











Figure 1



Assuming beam weight=0.55k/ft

ultimate dead load=1.2*(0.55+2)=3.06 k/ft

ultimate live load=1.6*20=32k

the ultimate moment from figure 2

Mu=604.32k-ft=7,251,840 lb-in
Figure 2

Mu/bd^2=Ф*ρ*fy*(1-ρ*fy/(1.7fc'))

bd^2=Mu/Ф*ρ*fy*(1-ρ*fy/(1.7fc')) assuming Ф=0.90

bd^2=7,251,840/0.9*0.01425*60,000*(1-0.01425*60,000/(1.7*4000))

bd^2=10779.45

trail and error selecting   bxd=20x22.5

beam dimension=20inx26in

checking beam weight=20*26*150/(144*1000)=0.541 k/ft    ok

As=ρ*b*d=0.01425*20*22.5=6.40 in2

using 7#9 placed at top because the moment is positive

As=7*1=7 in2

checking if ρ>ρmin

ρmin=3* fc'/fy and not less than 200/fy

ρmin=3* 4000/60000 and not less than 200/60000
ρmin=0.00316 and 0.00333     ok


checking if Ф=0.9 valid or no

(εt+0.003)/(d)=0.003/c

C=a/β1

β1=0.85 for fc'=4000 psi or less

 a=Asfy/(0.85*fc'*b)

a=7*60,000/(0.85*4000*20)=6.17in

C=a/β1=6.17/0.85=7.27in

εt=0.003*(22.5)/7.27-0.003=0.0063>0.005 so section is tension control Ф=0.9  is ok



checking if ФMn>Mu

ФMn=0.9*7.0*60,000*(22.5-6.17/2)=7,338,870 lb-in>Mu   ok





Comments

Videos from My Youtube channel

Popular posts from this blog

Binding wire for steel reinforcement

Rebar Splicing and Overlapping — ACI 318-19 Requirements Explained

Pile cap

Non-Working Pile Testing and Static Compression Load Test

stress-strain diagram for aluminium alloy and rubber

Bridge Diaphragm

The reasons behind the trimming of pile head

Nominal maximum size of coarse aggregate

why do we stagger reinforcement overlapping?

Repairing of concrete bulging