Claim and variation


Claim: when the contractor feels that he will suffer time delay and money loss due to different reasons such as a change in the tender drawing. or change on site condition such as encountering hard rocks while the tender document stating the absence of hard rock. in this case, the contractor will submit a detailed claim within 28 days explaining the reason for the claim and attaching the assertive document. however, if the soil mentioned in the tender is rock and the actual soil is sand. client cant reduces or cuts the cost for this item.







The variation introduced by the client. when the client asks to change some items such as tiles brand. the contractor, in this case, will be paid for cost and given an extension of time as compensation.



Comments

Videos from My Youtube channel

Popular posts from this blog

Pile cap

Rebar Splicing and Overlapping — ACI 318-19 Requirements Explained

Bridge Diaphragm

Moment Diagrams Constructed by the Method of Superposition

Repairing of concrete bulging

Example 1:Flexural stress calculation using transformed area method for rectangular beam with double layer of reinforcing bars

Non-Working Pile Testing and Static Compression Load Test

Analysis of T Beams

Prestressing stands debonding

shear key