Video from my YouTube channel

Subscribe to My You tube channel

Typical sequence of contract events(Red book)


The contract goes through a long sequence of events. the client or his agent will prepare the design for the contract. next step is issuing tendering document such as specification, drawing, and BOQ, etc. then the contractor will be assigned to do the job and the sequence continues until returning the performance security by the client . for simplification, I prepared the following diagram for contract events.






Comments

Videos from My Youtube channel

Popular posts from this blog

Repairing of concrete bulging

Non-Working Pile Testing and Static Compression Load Test

Prestressing strand manufacturing

Rebar Splicing and Overlapping — ACI 318-19 Requirements Explained

stress-strain diagram for aluminium alloy and rubber

Binding wire for steel reinforcement

Bridge Diaphragm

Pile cap

ACI Reinforcement Limits Explained: Minimum and Maximum Steel Area for Concrete Columns

Useful Engineering Courses