Video from my YouTube channel

Subscribe to My You tube channel

Typical sequence of contract events(Red book)


The contract goes through a long sequence of events. the client or his agent will prepare the design for the contract. next step is issuing tendering document such as specification, drawing, and BOQ, etc. then the contractor will be assigned to do the job and the sequence continues until returning the performance security by the client . for simplification, I prepared the following diagram for contract events.






Comments

Videos from My Youtube channel

Popular posts from this blog

Pile cap

Binding wire for steel reinforcement

Repairing of concrete bulging

Casing for piles

Bridge Diaphragm

Driven piles

Lateral support and skin reinforcement for reinforced beam

Non-Working Pile Testing and Static Compression Load Test

Equivalent Single Axle Load (ESAL) in Pavement Design

Chamfers for concrete structures