Video from my YouTube channel

Subscribe to My You tube channel

Example 7: design of inverted T-beam

Select reinforcing bars for the beam shown if Mu= 250 ft-k, fy= 60,000 psi, and fc'= 4000 psi. (Hint: Assume that the distance from the c.g. of the tensile steel to the c.g. of the compression block equals 0.9 times the effective depth, d, of the beam.) After a steel area is computed, check the assumed distance and revise the steel area if necessary. Is εt ≥0.005? 

Figure 1










Mu=ФMn

Mu=ФAsfy*(d-a/2)

d=24in
a will be equal to 4.80in if we assumed the distance between the center of compression and tensile force=0.9*d=21.6in
a=4.8

assuming Ф=0.9

Mu=250k-ft=3,000,0000lb-in

3,000,0000=0.9*60,000*As*(24-4.8/2)

3,000,0000=54,000As*(24-3.52As/2)

3,000,0000=1,296,000As-95,040As^2

47,520As^2-1,296,000As+3,000,000=0

As=2.95 in2



checking if the value of a is correct

a=As*fy/(0.85*fc'*b)

a=2.95*60,000/(0.85*4000*5)
a=10.40 in

so our assumption is wrong, we will calculate steel area again assuming a=10.4in
for a=10.40in, compression stress will be distributed over the first 6in of a beam with a width of 5in and another 4.40in of a beam with 15in width, for this case, we will have two blocks of compression stress as shown in figure 3
the force in first bloack=0.85*fc'*5*6=102,000lb
the force in second block=0.85*fc'*15*(10.4-6)=224,400lb
total compression force=326,400lb
locating the center of compressive force, taking the top of the beam as a reference line
x=(102,000*3+224,000*8.2)/326,400=6.575in

the moment arm between tensile and compressive force=24-6.56=17.44in

Mu=09*As*fy*moment arm

3,000,0000=0.9*60,000*As*17.425

As=3.18in2

checking a

As*fy=0.85*fc'*6*5+0.85*fc'*(a-6)*15
a=7.74in
so our assumption is wrong, we will calculate steel area again assuming a=7.74in
for a=10.40in, compression stress will be distributed over the first 6in of a beam with a width of 5in and another 1.74in of a beam with 15in width, for this case, we will have two blocks of compression stress as shown in figure 3

the force in first bloack=0.85*fc'*5*6=102,000lb
the force in second block=0.85*fc'*15*(7.74-6)=88,740lb
total compression force=190,740lb

x=(102,000*3+88740*6.87)/190,740=4.80in
the moment arm between tensile and compressive force=24-4.8=19.2in


Mu=09*As*fy*moment arm
3,000,0000=0.9*60,000*As*19.2
As=2.89in2

checking a

As*fy=0.85*fc'*6*5+0.85*fc'*(a-6)*15
a=7.4in very close so ok


(εt+0.003)/(d)=0.003/c

C=a/β1

β1=0.85 for fc'=4000 psi or less

 a=7.40in


C=a/β1=7.40/0.85=8.70in

εt=0.003*(24)/8.7-0.003=0.00>0.0053 so section is tension control Ф=0.9  is ok


Figure 2


Figure 3


Comments

Videos from My Youtube channel

Popular posts from this blog

Binding wire for steel reinforcement

stress-strain diagram for aluminium alloy and rubber

Concrete repair-selecting the repair method

Rebar Splicing and Overlapping — ACI 318-19 Requirements Explained

Non-Working Pile Testing and Static Compression Load Test

The reasons behind the trimming of pile head

Pile cap

Nominal maximum size of coarse aggregate

Repairing of concrete bulging

Tunnel lining systems-Ribbed system