Pile heave



Driving piles will cause soil displacement. As a result, the previously driven pile will move upward and laterally. Pile heave value directly proportional to soil displacement. Therefore, as the number of driven piles increased pile heave will increase. The heave in cohesive soil is significant. As a result, the heave should be considered in the design stage. Using low displacement piles and improved method of installation (such as predrilling to reduce soil displacement) may consider if the calculated heave values are enormous.

In the events of adjacent piles heave while driving new piles more than 13 mm for end bearing piles. Pile shall be re-driven. Similarly, adjacent piles shall be re-driven if the upward movement is more than 38 mm for friction piles.


Figure 2

Comments

Videos from My Youtube channel

Popular posts from this blog

Pile cap

Binding wire for steel reinforcement

Repairing of concrete bulging

Casing for piles

Non-Working Pile Testing and Static Compression Load Test

Bridge Diaphragm

Equivalent Single Axle Load (ESAL) in Pavement Design

Lateral support and skin reinforcement for reinforced beam

Example 1: Design of one-way slab

Whitney Rectangular Stress Distribution(derivation of beam expressions)